Energy

Energy

We support energy producers and plant owners — across Turkey and internationally — with the full mechanical and electrical engineering scope their facilities demand: turbine, generator, transformer and power distribution equipment installation, maintenance line setup, and industrial control systems integration. Working with established names across the energy sector, our teams have delivered projects spanning everything from equipment installation and automation integration to electrical infrastructure build-out and commissioning.


Energy projects carry demands that set them apart from other industrial sectors — strict safety classifications, zero tolerance for unplanned downtime, and installations spread across large and often remote sites. BIOS brings every discipline this requires under a single point of accountability: mechanical installation, heavy equipment logistics, electrical works, and industrial control systems integration. From renewable energy plants to conventional power infrastructure, from maintenance lines to SCADA-based monitoring — our project record reflects both the technical depth and the organisational discipline the sector demands.

Our Service Scope
  • Turbine, generator and transformer installation
  • Power distribution equipment and maintenance line setup
  • Electrical infrastructure and commissioning
  • Industrial control, automation and SCADA integration
  • Heavy equipment logistics and mechanical installation
Reference Project
LINDE H₂ Plant Mechanical, Electrical Installation and Commissioning Project

BIOS successfully completed the turnkey mechanical installation, electrical installation, piping, testing and commissioning works for the LINDE H₂ plant located at Tayras’ site.


The project included the safe unloading of machinery, equipment and process systems at the site, their transportation to final positions using suitable handling equipment, and the completion of mechanical installation works. Within the scope of process piping, fabrication and installation works were carried out. On the electrical side, BIOS completed the installation of cable trays and cable support systems, power, control and signal cabling, panel connections, field equipment connections, grounding works and cable labeling.


Following the installation phase, weld quality checks, connection verifications, insulation and continuity tests, functional checks, and pre-commissioning inspections for mechanical, electrical and instrumentation systems were completed. All works were carried out in accordance with project documentation, quality control procedures and occupational health and safety requirements, ensuring that the plant was delivered in a safe, sustainable and operation-ready condition.


This project demonstrates BIOS’ capability to manage mechanical installation, electrical installation, piping, welded fabrication, testing and commissioning processes under a single turnkey project coordination structure for hydrogen plants and industrial process systems.

Hydrogen / Industrial Process
Industry
Tayras Site / LINDE H₂ Plant
Project Location
Turnkey
Scope
Mechanical + Electrical Installation
Application Area